EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
"Aluminaire"
-
Last 10 Modified Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (198)
Finances
- (4)
Research
- (1)
Media
- (5)
CAD
- (3)
Tooling
- (1)
Prototype
- (1)
-
Prototype Construction
Flying Pics
- (2)
Workshop
- (4)
Tools
Fuselage
Firewall
Tail Feathers
- (37)
Wings
- (109)
Controls
Landing Gear
- (1)
Lighting
- (19)
Instrument Panel
- (3)
Avionics
- (2)
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
W&B
- (1)
Kit
- (2)
AirVenture
- (1)
-
AirVenture 2021
EAA Speaker
- (1)
Young Eagles
Builder Name:
Glenn Gordon
-
Project:
Timber Tiger - ST-L Clipped-wing
-
VIEW REPORTS
Total Hours:
583.9
Start/Last Date:
Jun 01, 2022 - No Finish Date
Engine:
Rotax 912ULS with big bore cylinder upgrade
Propeller:
Sensenich Ground Adjustable
Panel:
VFR / Glass / ADS-B / Comm / Xpndr / 2 Axis Autopilot
Friendly URL:
https://eaabuilderslog.org?s="Aluminaire"
Home or Last Project Picture
Feb 19, 2024
Final prep of wings ready for covering tasks.
- (1 hour)
Category: Wings
Final prep of wings ready for covering tasks.
20240115_165415.jpg
20240115_165441.jpg
20240115_165452.jpg
20240115_165518.jpg
20240115_165614.jpg
20240115_165630.jpg
Jan 27, 2024
Aileron Bellcrank cover fabrication
- (2 hours)
Category: Tail Feathers
Aileron Bellcrank cover fabrication
20240127_143644.jpg
20240127_150916.jpg
Feb 19, 2024
Elevator Trim Rod cutout
- (1 hour)
Category: Tail Feathers
Elevator Trim Rod cutout
20240128_162727.jpg
Dec 31, 1969
Rudder Fairing platenut install.
- (2 hours)
Category: Tail Feathers
, Rudder Fairing platenut install.
20240128_162716.jpg
Dec 31, 1969
Elevator trim tab positioning, Rudder Fairing platenut install.
- (4 hours)
Category: Tail Feathers
Elevator trim tab positioning, Rudder Fairing platenut install.
20240127_151111.jpg
20240127_151116.jpg
20240127_151121.jpg
20240127_162936.jpg
20240127_163217.jpg
20240127_164522.jpg
Nov 17, 2023
Installed tip light mounts. Added micro balloon slurry.
- (2 hours)
Category: Lighting
Installed tip light mounts. Added micro balloon slurry.
20231117_125846.jpg
20231117_140743.jpg
20231117_140753.jpg
Feb 04, 2024
Finalized instrument panel design
- (4 hours)
Category: Instrument Panel
Finalized instrument panel design
Panel_1.jpg
Panel_2.jpg
panel_switches.jpg
Jan 31, 2024
Nearly finalized instrument panel design
- (5 hours)
Category: Instrument Panel
Nearly finalized instrument panel design
st_instrument_panel_iso.jpg
st_instrument_panel_ortho.jpg
Jan 27, 2024
Panel Concept
- (6 hours)
Category: Instrument Panel
Panel Concept
panel.jpg
Jan 21, 2024
Completed fabrication of elevator trim tabs.
Category: Tail Feathers
Completed fabrication of elevator trim tabs.
20240121_135850.jpg
20240121_135858.jpg
20240121_105256.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.